18 Million Tons of Coal Ash: Turning Cherepetskaya GRES Waste into High-Strength Expanded Clay

The ash disposal site of Cherepetskaya GRES holds over 18 million tons of coal ash waste. For the utility it is a liability and an environmental risk. For us it is the raw-material base of a high-strength expanded clay plant.

Case cover: abstract visualization of granules
Fig. 01 · Case cover: abstract visualization of granules

01The problem: 18 million tons of “free” raw material

Coal ash-and-slag waste (ASW) is the largest-volume industrial waste of thermal power generation. The Cherepetskaya GRES disposal site covers dozens of hectares, needs constant maintenance and puts an environmental burden on the region. The usual answer is to conserve the site, which means costs and no revenue.

We treat the site as a ready-made quarry: the raw material needs neither purchasing nor mining. Its cost is zero or negative once disposal fees are counted.

02The technology: next-generation expanded clay

The FORTIS project processes ASW into high-strength structural expanded clay. The key lab result: granules 3–4 times stronger than conventional expanded clay at comparable bulk density.

That opens structural applications where ordinary expanded clay fails strength requirements, on top of the lightweight-concrete market. Utilization of the source waste is 98–99%, so the dump becomes product with almost no residue.

03Key parameters

Granule strength
3–4× ordinary expanded clay
ASW utilization
98–99%
Standard
GOST 25820-2014
Patents
9, valid until 2035–2044

Building materials are the base level of the project; at launch it does not depend on metal recovery. Project economics on request: my@ostoya.ru.

04The three-level model

FORTIS follows cascade logic. Level 1 is building materials (expanded clay), which cover all costs. Level 2 is extraction of rare-earth metals and other valuable components from the same streams during raw-material preparation: the feedstock is already prepared at this stage, so no separate mining is needed. Level 3 is own power from gasification of unburnt carbon.

The output of each level is the input of the next. That is what cascade processing means.

05Scientific and regulatory base

The technology is developed with research institutes (IGI, IPKON RAS, IPCE RAS) jointly with AXIONIT. The product is tested at NIIZHB and VNIIG.

An application for an experimental legal regime has been sent to ASI. The project is supported by the Tula Region (protocol of 07.04.2026).

06What’s next

Current status: NIIZHB trials and an experimental legal regime application at ASI. Next steps: a pilot industrial line and the first commercial contract. The project is open to industrial partners.